Monday, January 08, 2007
Email from Mr Cameron Thompson Federal MP for Blair.
Dear Maarten,
The article below is one I wrote for the Queensland Times which explains the value of the Goodna Bypass (from dinmore to gailes) and its capacity to solve once and for all the difficulties caused by the poor alignment and heavy congestion of the Ipswich Motorway in that area.
The final report of the full planning study undertaken by Maunsells to select the route, prepare the business case and provide all the data needed to allow the project to go to tender is due to be received by state and federal ministers in the next three weeks. As I understand it, an interim or draft final report has been submitted for review by the project steering committee (which includes federal and state departments) and the final (for ministerial consideration) will follow.
Apart from the advantages outlined below, the bypass will still be completed up to a year earlier than it was ever possible to upgrade the existing road over this eection and without much of the accompanying disruption.
As you know, there will still be disruption when work on the Commonwealth-funded $255M upgrade of the Logan interchange begins in March. This work will include the Goodna merge - the site of the terrible accident on January 4.
Tenders to six-lane the Gailes to Darra section and upgrade the Centenary interchange, for which full funding was provided by the Commonwealth in November 2005 are also due to be let by the state government (which is the constructing authority) in the near future.
Cameron Thompson.
Is Ipswich and our gridlocked \nmotorway worth a further $2 billion investment by the Commonwealth Government on \nbehalf of Australian taxpayers? \nCameron Thompson argues the yes case.\nIpswich is growing fast but the Goodna Bypass (a $2Bn motorway proposed by \nthe Commonwealth) is a vision for a future Ipswich that is both prosperous and \nliveable.\nA purpose-built motorway, the Goodna Bypass takes heavy freight away from \nlocal suburbs. New jobs will emerge in dormant industrial areas to be granted \nroad access for the first time. \nWith the bypass in place, the Ipswich Motorway is reborn as a local arterial \naccess road. Residents get better access to shopping, neighbourhood travel and \ncommuting. Bus and rail stations are more readily accessible. Local motorists \nreclaim their use of the Ipswich Motorway – a road that will be carrying less \nthan half its traffic capacity, and with more onramps and offramps to use. \nAccidents will no longer mean being stuck in traffic for hours.\nBusinesses and commuters save tens of millions of dollars a year in reduced \ntravel time. Tourists visiting Ipswich enter the city amid expansive river \nviews.\nMeanwhile, powerful, sustained growth in Ipswich and further along the \nwestern development corridor will push our city to double and treble its \npopulation. Coupled to the booming flow of interstate trade and the dynamism of \nthe new Ipswich, the Bypass will facilitate total traffic through the Ipswich \nBrisbane corridor of more than 150,000 vehicles a day. \nThese are the consequences of Commonwealth Government plans to build the \nGoodna Bypass as part of a new western corridor traffic network.\nThe ongoing debate about the Ipswich Motorway and the Goodna Bypass is more \nthan an argument about bitumen and lane sizes – it is about the future of \nIpswich, from tomorrow to beyond 2032. It \nis about how liveable and practical our city is, how effectively business and \nindustry can operate, and how we can develop in the future with infrastructure \nthat can cope.",1]
);
//-->
Is Ipswich and our gridlocked motorway worth a further $2 billion investment by the Commonwealth Government on behalf of Australian taxpayers?
Cameron Thompson argues the yes case.
Ipswich is growing fast but the Goodna Bypass (a $2Bn motorway proposed by the Commonwealth) is a vision for a future Ipswich that is both prosperous and liveable.
A purpose-built motorway, the Goodna Bypass takes heavy freight away from local suburbs. New jobs will emerge in dormant industrial areas to be granted road access for the first time.
With the bypass in place, the Ipswich Motorway is reborn as a local arterial access road. Residents get better access to shopping, neighbourhood travel and commuting. Bus and rail stations are more readily accessible. Local motorists reclaim their use of the Ipswich Motorway – a road that will be carrying less than half its traffic capacity, and with more onramps and offramps to use. Accidents will no longer mean being stuck in traffic for hours.
Businesses and commuters save tens of millions of dollars a year in reduced travel time. Tourists visiting Ipswich enter the city amid expansive river views.
Meanwhile, powerful, sustained growth in Ipswich and further along the western development corridor will push our city to double and treble its population. Coupled to the booming flow of interstate trade and the dynamism of the new Ipswich, the Bypass will facilitate total traffic through the Ipswich Brisbane corridor of more than 150,000 vehicles a day.
These are the consequences of Commonwealth Government plans to build the Goodna Bypass as part of a new western corridor traffic network.
The ongoing debate about the Ipswich Motorway and the Goodna Bypass is more than an argument about bitumen and lane sizes – it is about the future of Ipswich, from tomorrow to beyond 2032. It is about how liveable and practical our city is, how effectively business and industry can operate, and how we can develop in the future with infrastructure that can cope.
\nThe plans for the Goodna Bypass, which is an extension of the Logan Motorway \nto join directly to the Warrego and Cunningham Highways at Dinmore, are \nprogressing. Engineers drilled and surveyed along three proposed routes and gave \neach a green light. This has been narrowed down to a choice of two which will be \nresolved when business cases are drawn up and submitted within six weeks.\nThe selection of the final route and the completion of its business case will \nclear the way for tenders for the construction of the Goodna Bypass to be drawn \nup.\nNow is the time for Ipswich to put the chaos of the Ipswich Motorway behind \nus, while taking advantage of a better lifestyle and opportunities that will \nadvance our city.\nFor residents, this means our suburbs will no longer be divided by 100,000 \nhigh speed vehicles a day. Traffic on the existing motorway, at Goodna, will be \nreduced by 60%. Instead of interstate trucks, it will be there to serve the \nlocal community. The Ipswich City Council itself could use the opportunity to \nbring our suburbs together with a new range of better bus routes via the old \nmotorway. \nResidents travelling east from Ebbw Vale on the old road will find the drive \na lot quieter with more easy entries and exits, and few trucks. Like 60 per cent \nof the total traffic, the vast majority of trucks will divert to the Bypass.\nBusinesses will be major beneficiaries. By reclaiming the suburbs, access to \nlocal businesses and shops becomes more practical and effective. Their viability \nwill increase through reopening their local customer base as well as reducing \ntransport-based operating costs, such as freight delays and fuel costs caused by \nMotorway hold-ups. \nIndustry will have a direct route from the Warrego and Cunningham Highways to \nthe Logan Motorway, which will allow freight to be transported to and from ports \nand the airport without the wear and tear of stop start traffic – a dedicated \nroute; a high speed, quality road that avoids suburban traffic. Travel Time \nSavings – the level of economic impact from more efficient travel – would \nbenefit the freight industry by $50million a year by 2025.",1]
);
//-->
The plans for the Goodna Bypass, which is an extension of the Logan Motorway to join directly to the Warrego and Cunningham Highways at Dinmore, are progressing. Engineers drilled and surveyed along three proposed routes and gave each a green light. This has been narrowed down to a choice of two which will be resolved when business cases are drawn up and submitted within six weeks.
The selection of the final route and the completion of its business case will clear the way for tenders for the construction of the Goodna Bypass to be drawn up.
Now is the time for Ipswich to put the chaos of the Ipswich Motorway behind us, while taking advantage of a better lifestyle and opportunities that will advance our city.
For residents, this means our suburbs will no longer be divided by 100,000 high speed vehicles a day. Traffic on the existing motorway, at Goodna, will be reduced by 60%. Instead of interstate trucks, it will be there to serve the local community. The Ipswich City Council itself could use the opportunity to bring our suburbs together with a new range of better bus routes via the old motorway.
Residents travelling east from Ebbw Vale on the old road will find the drive a lot quieter with more easy entries and exits, and few trucks. Like 60 per cent of the total traffic, the vast majority of trucks will divert to the Bypass.
Businesses will be major beneficiaries. By reclaiming the suburbs, access to local businesses and shops becomes more practical and effective. Their viability will increase through reopening their local customer base as well as reducing transport-based operating costs, such as freight delays and fuel costs caused by Motorway hold-ups.
Industry will have a direct route from the Warrego and Cunningham Highways to the Logan Motorway, which will allow freight to be transported to and from ports and the airport without the wear and tear of stop start traffic – a dedicated route; a high speed, quality road that avoids suburban traffic. Travel Time Savings – the level of economic impact from more efficient travel – would benefit the freight industry by $50million a year by 2025.
\nAnd Ipswich will gain a beautiful, riverside entry to the city which reunites \nour identity with the river.\nIn short, the Bypass will give Ipswich better options and access, and a more \neffective service centre. The benefits extend further to include opportunities \nthat will face Ipswich in the future.\nWith an efficient transport system; one where there are alternative routes in \nthe event of a blockage, there will be capacity to effectively meet our traffic \nrequirements beyond 2032 so Ipswich can embrace opportunities for \ndevelopment.\nAn example of this on the Redbank Peninsula (that large area of undeveloped \nland behind the Redbank railway workshops). The Ipswich City Council says that \nopening up the Peninsula for development will create 10,000 jobs. It also gives \nIpswich an opportunity to attract industry and transport operators at Rocklea to \nRedbank, creating an effective, centralised and key regional transport hub.\nThis means local jobs, as does the boost to business and industry, and the \nincrease in the capacity and capability of our infrastructure.\nThe Goodna Bypass will create a multitude of opportunities. It’s time other \ngovernments got behind our vision of a long term strategy for jobs, growth and a \nbetter lifestyle in the Ipswich region.\nAt present, critics of the bypass have only one plan they promote as an \nalternative. They advocate the addition of two extra lanes on the current \nfour-lane motorway as if such a scheme could provide Ipswich a real option.\nIt cannot. Engineers say the accepted capacity of a six lane road is 80,000 \nvehicles a day. When force-fed traffic on the existing road has already passed \n100,000 vehicles a day, this is the full extent of the limited capacity offered \nas a solution by the naysayers of the Labor Party.\nCompared to their proposals, the Bypass will also be completed in less time. \nCrucially, if the State Government recognises the importance of delivering the \nroad in an accelerated time frame, it can declare the construction of the Goodna \nBypass a ‘major project’ under the State Development and Public Works \nOrganisation Act. Recommended by Maunsells Australia, this would speed the \ndelivery of the Bypass, enabling it to open in 2010. ",1]
);
//-->
And Ipswich will gain a beautiful, riverside entry to the city which reunites our identity with the river.
In short, the Bypass will give Ipswich better options and access, and a more effective service centre. The benefits extend further to include opportunities that will face Ipswich in the future.
With an efficient transport system; one where there are alternative routes in the event of a blockage, there will be capacity to effectively meet our traffic requirements beyond 2032 so Ipswich can embrace opportunities for development.
An example of this on the Redbank Peninsula (that large area of undeveloped land behind the Redbank railway workshops). The Ipswich City Council says that opening up the Peninsula for development will create 10,000 jobs. It also gives Ipswich an opportunity to attract industry and transport operators at Rocklea to Redbank, creating an effective, centralised and key regional transport hub.
This means local jobs, as does the boost to business and industry, and the increase in the capacity and capability of our infrastructure.
The Goodna Bypass will create a multitude of opportunities. It’s time other governments got behind our vision of a long term strategy for jobs, growth and a better lifestyle in the Ipswich region.
At present, critics of the bypass have only one plan they promote as an alternative. They advocate the addition of two extra lanes on the current four-lane motorway as if such a scheme could provide Ipswich a real option.
It cannot. Engineers say the accepted capacity of a six lane road is 80,000 vehicles a day. When force-fed traffic on the existing road has already passed 100,000 vehicles a day, this is the full extent of the limited capacity offered as a solution by the naysayers of the Labor Party.
Compared to their proposals, the Bypass will also be completed in less time. Crucially, if the State Government recognises the importance of delivering the road in an accelerated time frame, it can declare the construction of the Goodna Bypass a ‘major project’ under the State Development and Public Works Organisation Act. Recommended by Maunsells Australia, this would speed the delivery of the Bypass, enabling it to open in 2010.
\nThese benefits are quite apart from avoiding the problems that would have \nbeen caused by eight years of upgrading the Motorway; digging it up with no \nalternative routes for traffic. The consequence of this chaos in our local \ncommunity – residents, businesses, and industry – would have been \ndisastrous.\nWe will have some insight into the disruption this would have caused when the \nState Government finally starts work on the Logan Motorway interchange, for \nwhich we have been waiting since full Commonwealth funding was provided in April \n2004.\nMy challenge to those so staunchly opposed to the Bypass is to ask them why \nthey would deny Ipswich the reality of this vision for our future and our \ncommunity. Isn’t it worth every cent to give Ipswichians the future we \ndeserve?",1]
);
//-->
These benefits are quite apart from avoiding the problems that would have been caused by eight years of upgrading the Motorway; digging it up with no alternative routes for traffic. The consequence of this chaos in our local community – residents, businesses, and industry – would have been disastrous.
We will have some insight into the disruption this would have caused when the State Government finally starts work on the Logan Motorway interchange, for which we have been waiting since full Commonwealth funding was provided in April 2004.
My challenge to those so staunchly opposed to the Bypass is to ask them why they would deny Ipswich the reality of this vision for our future and our community. Isn’t it worth every cent to give Ipswichians the future we deserve?
The article below is one I wrote for the Queensland Times which explains the value of the Goodna Bypass (from dinmore to gailes) and its capacity to solve once and for all the difficulties caused by the poor alignment and heavy congestion of the Ipswich Motorway in that area.
The final report of the full planning study undertaken by Maunsells to select the route, prepare the business case and provide all the data needed to allow the project to go to tender is due to be received by state and federal ministers in the next three weeks. As I understand it, an interim or draft final report has been submitted for review by the project steering committee (which includes federal and state departments) and the final (for ministerial consideration) will follow.
Apart from the advantages outlined below, the bypass will still be completed up to a year earlier than it was ever possible to upgrade the existing road over this eection and without much of the accompanying disruption.
As you know, there will still be disruption when work on the Commonwealth-funded $255M upgrade of the Logan interchange begins in March. This work will include the Goodna merge - the site of the terrible accident on January 4.
Tenders to six-lane the Gailes to Darra section and upgrade the Centenary interchange, for which full funding was provided by the Commonwealth in November 2005 are also due to be let by the state government (which is the constructing authority) in the near future.
Cameron Thompson.
Is Ipswich and our gridlocked \nmotorway worth a further $2 billion investment by the Commonwealth Government on \nbehalf of Australian taxpayers? \nCameron Thompson argues the yes case.\nIpswich is growing fast but the Goodna Bypass (a $2Bn motorway proposed by \nthe Commonwealth) is a vision for a future Ipswich that is both prosperous and \nliveable.\nA purpose-built motorway, the Goodna Bypass takes heavy freight away from \nlocal suburbs. New jobs will emerge in dormant industrial areas to be granted \nroad access for the first time. \nWith the bypass in place, the Ipswich Motorway is reborn as a local arterial \naccess road. Residents get better access to shopping, neighbourhood travel and \ncommuting. Bus and rail stations are more readily accessible. Local motorists \nreclaim their use of the Ipswich Motorway – a road that will be carrying less \nthan half its traffic capacity, and with more onramps and offramps to use. \nAccidents will no longer mean being stuck in traffic for hours.\nBusinesses and commuters save tens of millions of dollars a year in reduced \ntravel time. Tourists visiting Ipswich enter the city amid expansive river \nviews.\nMeanwhile, powerful, sustained growth in Ipswich and further along the \nwestern development corridor will push our city to double and treble its \npopulation. Coupled to the booming flow of interstate trade and the dynamism of \nthe new Ipswich, the Bypass will facilitate total traffic through the Ipswich \nBrisbane corridor of more than 150,000 vehicles a day. \nThese are the consequences of Commonwealth Government plans to build the \nGoodna Bypass as part of a new western corridor traffic network.\nThe ongoing debate about the Ipswich Motorway and the Goodna Bypass is more \nthan an argument about bitumen and lane sizes – it is about the future of \nIpswich, from tomorrow to beyond 2032. It \nis about how liveable and practical our city is, how effectively business and \nindustry can operate, and how we can develop in the future with infrastructure \nthat can cope.",1]
);
//-->
Is Ipswich and our gridlocked motorway worth a further $2 billion investment by the Commonwealth Government on behalf of Australian taxpayers?
Cameron Thompson argues the yes case.
Ipswich is growing fast but the Goodna Bypass (a $2Bn motorway proposed by the Commonwealth) is a vision for a future Ipswich that is both prosperous and liveable.
A purpose-built motorway, the Goodna Bypass takes heavy freight away from local suburbs. New jobs will emerge in dormant industrial areas to be granted road access for the first time.
With the bypass in place, the Ipswich Motorway is reborn as a local arterial access road. Residents get better access to shopping, neighbourhood travel and commuting. Bus and rail stations are more readily accessible. Local motorists reclaim their use of the Ipswich Motorway – a road that will be carrying less than half its traffic capacity, and with more onramps and offramps to use. Accidents will no longer mean being stuck in traffic for hours.
Businesses and commuters save tens of millions of dollars a year in reduced travel time. Tourists visiting Ipswich enter the city amid expansive river views.
Meanwhile, powerful, sustained growth in Ipswich and further along the western development corridor will push our city to double and treble its population. Coupled to the booming flow of interstate trade and the dynamism of the new Ipswich, the Bypass will facilitate total traffic through the Ipswich Brisbane corridor of more than 150,000 vehicles a day.
These are the consequences of Commonwealth Government plans to build the Goodna Bypass as part of a new western corridor traffic network.
The ongoing debate about the Ipswich Motorway and the Goodna Bypass is more than an argument about bitumen and lane sizes – it is about the future of Ipswich, from tomorrow to beyond 2032. It is about how liveable and practical our city is, how effectively business and industry can operate, and how we can develop in the future with infrastructure that can cope.
\nThe plans for the Goodna Bypass, which is an extension of the Logan Motorway \nto join directly to the Warrego and Cunningham Highways at Dinmore, are \nprogressing. Engineers drilled and surveyed along three proposed routes and gave \neach a green light. This has been narrowed down to a choice of two which will be \nresolved when business cases are drawn up and submitted within six weeks.\nThe selection of the final route and the completion of its business case will \nclear the way for tenders for the construction of the Goodna Bypass to be drawn \nup.\nNow is the time for Ipswich to put the chaos of the Ipswich Motorway behind \nus, while taking advantage of a better lifestyle and opportunities that will \nadvance our city.\nFor residents, this means our suburbs will no longer be divided by 100,000 \nhigh speed vehicles a day. Traffic on the existing motorway, at Goodna, will be \nreduced by 60%. Instead of interstate trucks, it will be there to serve the \nlocal community. The Ipswich City Council itself could use the opportunity to \nbring our suburbs together with a new range of better bus routes via the old \nmotorway. \nResidents travelling east from Ebbw Vale on the old road will find the drive \na lot quieter with more easy entries and exits, and few trucks. Like 60 per cent \nof the total traffic, the vast majority of trucks will divert to the Bypass.\nBusinesses will be major beneficiaries. By reclaiming the suburbs, access to \nlocal businesses and shops becomes more practical and effective. Their viability \nwill increase through reopening their local customer base as well as reducing \ntransport-based operating costs, such as freight delays and fuel costs caused by \nMotorway hold-ups. \nIndustry will have a direct route from the Warrego and Cunningham Highways to \nthe Logan Motorway, which will allow freight to be transported to and from ports \nand the airport without the wear and tear of stop start traffic – a dedicated \nroute; a high speed, quality road that avoids suburban traffic. Travel Time \nSavings – the level of economic impact from more efficient travel – would \nbenefit the freight industry by $50million a year by 2025.",1]
);
//-->
The plans for the Goodna Bypass, which is an extension of the Logan Motorway to join directly to the Warrego and Cunningham Highways at Dinmore, are progressing. Engineers drilled and surveyed along three proposed routes and gave each a green light. This has been narrowed down to a choice of two which will be resolved when business cases are drawn up and submitted within six weeks.
The selection of the final route and the completion of its business case will clear the way for tenders for the construction of the Goodna Bypass to be drawn up.
Now is the time for Ipswich to put the chaos of the Ipswich Motorway behind us, while taking advantage of a better lifestyle and opportunities that will advance our city.
For residents, this means our suburbs will no longer be divided by 100,000 high speed vehicles a day. Traffic on the existing motorway, at Goodna, will be reduced by 60%. Instead of interstate trucks, it will be there to serve the local community. The Ipswich City Council itself could use the opportunity to bring our suburbs together with a new range of better bus routes via the old motorway.
Residents travelling east from Ebbw Vale on the old road will find the drive a lot quieter with more easy entries and exits, and few trucks. Like 60 per cent of the total traffic, the vast majority of trucks will divert to the Bypass.
Businesses will be major beneficiaries. By reclaiming the suburbs, access to local businesses and shops becomes more practical and effective. Their viability will increase through reopening their local customer base as well as reducing transport-based operating costs, such as freight delays and fuel costs caused by Motorway hold-ups.
Industry will have a direct route from the Warrego and Cunningham Highways to the Logan Motorway, which will allow freight to be transported to and from ports and the airport without the wear and tear of stop start traffic – a dedicated route; a high speed, quality road that avoids suburban traffic. Travel Time Savings – the level of economic impact from more efficient travel – would benefit the freight industry by $50million a year by 2025.
\nAnd Ipswich will gain a beautiful, riverside entry to the city which reunites \nour identity with the river.\nIn short, the Bypass will give Ipswich better options and access, and a more \neffective service centre. The benefits extend further to include opportunities \nthat will face Ipswich in the future.\nWith an efficient transport system; one where there are alternative routes in \nthe event of a blockage, there will be capacity to effectively meet our traffic \nrequirements beyond 2032 so Ipswich can embrace opportunities for \ndevelopment.\nAn example of this on the Redbank Peninsula (that large area of undeveloped \nland behind the Redbank railway workshops). The Ipswich City Council says that \nopening up the Peninsula for development will create 10,000 jobs. It also gives \nIpswich an opportunity to attract industry and transport operators at Rocklea to \nRedbank, creating an effective, centralised and key regional transport hub.\nThis means local jobs, as does the boost to business and industry, and the \nincrease in the capacity and capability of our infrastructure.\nThe Goodna Bypass will create a multitude of opportunities. It’s time other \ngovernments got behind our vision of a long term strategy for jobs, growth and a \nbetter lifestyle in the Ipswich region.\nAt present, critics of the bypass have only one plan they promote as an \nalternative. They advocate the addition of two extra lanes on the current \nfour-lane motorway as if such a scheme could provide Ipswich a real option.\nIt cannot. Engineers say the accepted capacity of a six lane road is 80,000 \nvehicles a day. When force-fed traffic on the existing road has already passed \n100,000 vehicles a day, this is the full extent of the limited capacity offered \nas a solution by the naysayers of the Labor Party.\nCompared to their proposals, the Bypass will also be completed in less time. \nCrucially, if the State Government recognises the importance of delivering the \nroad in an accelerated time frame, it can declare the construction of the Goodna \nBypass a ‘major project’ under the State Development and Public Works \nOrganisation Act. Recommended by Maunsells Australia, this would speed the \ndelivery of the Bypass, enabling it to open in 2010. ",1]
);
//-->
And Ipswich will gain a beautiful, riverside entry to the city which reunites our identity with the river.
In short, the Bypass will give Ipswich better options and access, and a more effective service centre. The benefits extend further to include opportunities that will face Ipswich in the future.
With an efficient transport system; one where there are alternative routes in the event of a blockage, there will be capacity to effectively meet our traffic requirements beyond 2032 so Ipswich can embrace opportunities for development.
An example of this on the Redbank Peninsula (that large area of undeveloped land behind the Redbank railway workshops). The Ipswich City Council says that opening up the Peninsula for development will create 10,000 jobs. It also gives Ipswich an opportunity to attract industry and transport operators at Rocklea to Redbank, creating an effective, centralised and key regional transport hub.
This means local jobs, as does the boost to business and industry, and the increase in the capacity and capability of our infrastructure.
The Goodna Bypass will create a multitude of opportunities. It’s time other governments got behind our vision of a long term strategy for jobs, growth and a better lifestyle in the Ipswich region.
At present, critics of the bypass have only one plan they promote as an alternative. They advocate the addition of two extra lanes on the current four-lane motorway as if such a scheme could provide Ipswich a real option.
It cannot. Engineers say the accepted capacity of a six lane road is 80,000 vehicles a day. When force-fed traffic on the existing road has already passed 100,000 vehicles a day, this is the full extent of the limited capacity offered as a solution by the naysayers of the Labor Party.
Compared to their proposals, the Bypass will also be completed in less time. Crucially, if the State Government recognises the importance of delivering the road in an accelerated time frame, it can declare the construction of the Goodna Bypass a ‘major project’ under the State Development and Public Works Organisation Act. Recommended by Maunsells Australia, this would speed the delivery of the Bypass, enabling it to open in 2010.
\nThese benefits are quite apart from avoiding the problems that would have \nbeen caused by eight years of upgrading the Motorway; digging it up with no \nalternative routes for traffic. The consequence of this chaos in our local \ncommunity – residents, businesses, and industry – would have been \ndisastrous.\nWe will have some insight into the disruption this would have caused when the \nState Government finally starts work on the Logan Motorway interchange, for \nwhich we have been waiting since full Commonwealth funding was provided in April \n2004.\nMy challenge to those so staunchly opposed to the Bypass is to ask them why \nthey would deny Ipswich the reality of this vision for our future and our \ncommunity. Isn’t it worth every cent to give Ipswichians the future we \ndeserve?",1]
);
//-->
These benefits are quite apart from avoiding the problems that would have been caused by eight years of upgrading the Motorway; digging it up with no alternative routes for traffic. The consequence of this chaos in our local community – residents, businesses, and industry – would have been disastrous.
We will have some insight into the disruption this would have caused when the State Government finally starts work on the Logan Motorway interchange, for which we have been waiting since full Commonwealth funding was provided in April 2004.
My challenge to those so staunchly opposed to the Bypass is to ask them why they would deny Ipswich the reality of this vision for our future and our community. Isn’t it worth every cent to give Ipswichians the future we deserve?
Wednesday, January 03, 2007
Email to Queensland Federal Members of Parliament
Dear Queensland Federal Members of Parliament:
Today a young mother of 23years of age was killed on the Federal Highway known as the Ipswich Motorway, and another eight (8) motorist and voters were injured.
And this is a result of the inaction off both the Federal Govt and the Queensland State Govt, this accident should have never happened and I for one do not care who is too blame or who should have fixed this problem.
I am sure that if a member of the motoring public who was from any part of Queensland let alone Australia, and they were killed or injured on this disgracefully piece of highway(Goat Track) their family would not give a toss who was responsible.
Maybe as Queensland Federal Members of Parliament you could make representation to the Prime Minister Mr Howard and have him pull himself away from the cricket and deal with this disgraceful highway.
Also to keep you up to date with the News follow the links: http://www.abc.net.au/news/newsitems/200701/s1821050.htm
Also here is a link to IMF: http://littleozzybloke.com/ourplace/index.php?s=9f9734c7cde7f71c0391767d65e980a4 &
And : http://fix-ipswich-motorway-now.blogspot.com/
I realise that you maybe still on your holidays, however there is no time like the present to fix this disgracefully mess before someone else is KILLED or INJURED.
Be sure to listen to Radio in Brisbane as the HEAT is going to be applied from now, until the NEXT FEDERAL ELECTION.
Awaiting your replies, please note that if you do not reply that will also be passed on.
Regards a concerned voter.
Maarten Vanderhaar.
Today a young mother of 23years of age was killed on the Federal Highway known as the Ipswich Motorway, and another eight (8) motorist and voters were injured.
And this is a result of the inaction off both the Federal Govt and the Queensland State Govt, this accident should have never happened and I for one do not care who is too blame or who should have fixed this problem.
I am sure that if a member of the motoring public who was from any part of Queensland let alone Australia, and they were killed or injured on this disgracefully piece of highway(Goat Track) their family would not give a toss who was responsible.
Maybe as Queensland Federal Members of Parliament you could make representation to the Prime Minister Mr Howard and have him pull himself away from the cricket and deal with this disgraceful highway.
Also to keep you up to date with the News follow the links: http://www.abc.net.au/news/newsitems/200701/s1821050.htm
Also here is a link to IMF: http://littleozzybloke.com/ourplace/index.php?s=9f9734c7cde7f71c0391767d65e980a4 &
And : http://fix-ipswich-motorway-now.blogspot.com/
I realise that you maybe still on your holidays, however there is no time like the present to fix this disgracefully mess before someone else is KILLED or INJURED.
Be sure to listen to Radio in Brisbane as the HEAT is going to be applied from now, until the NEXT FEDERAL ELECTION.
Awaiting your replies, please note that if you do not reply that will also be passed on.
Regards a concerned voter.
Maarten Vanderhaar.
Tuesday, December 26, 2006
Reply from Peter Lindsay MP
Maarten At the last election the Federal Govt gave $500 million for your road. Nationalhighway is designed and built by the State Govt. They have not yet spent a penny on new bitumen! With the way Beattie has mismanaged Water and Health why should we besurprised? So when you speakof protests just get the govern ent right.By the way roads in Canberra are not funded by the feds.
Peter
Peter
Labels: Political, ReplyEmails.
Monday, December 25, 2006
Email to Queensland Members of the Federal Paliament
Dear Queensland Federal Members of the Australian Parliament.
Today the 26th of December 2007,their were several accident on this DANGEROUS PIECE off FEDERAL HIGHWAY.
In fact two accidents alone involved eleven (11) vehicles as per the radio traffic report, to the best of my knowledge nobody was seriously injured.
Attached is a photo off a private protest alongside the Ipswich Motorway at Riverview, I do not have to remind members that a FEDERAL ELECTION is approaching and small protest like this grow into large protests.
What I want is for you the members for Queensland, no matter what party you belong too put in 100% and get this MOTORWAY FIXED enough stalling and fix the BLOODY THING.
This GOAT TRACK affects approximately ONE Hundred and Forty Thousand Motorist ( Voters) Daily, Motorist from all over Queensland have to use this highway.
So when a fellow Queenslander from Roma or Mt Isa or Quilpie or Longreach has an accident on this highway they will remember.
If this road was around Canberra, it would have been fixed along time ago, well it is in Brisbane and affects the lives of average people on a daily basis.
I hope that you all had an enjoyable Christmas and a Safe one.
Awaiting your replies:.
Maarten Vanderhaar http://fix-ipswich-motorway-now.blogspot.com/
Today the 26th of December 2007,their were several accident on this DANGEROUS PIECE off FEDERAL HIGHWAY.
In fact two accidents alone involved eleven (11) vehicles as per the radio traffic report, to the best of my knowledge nobody was seriously injured.
Attached is a photo off a private protest alongside the Ipswich Motorway at Riverview, I do not have to remind members that a FEDERAL ELECTION is approaching and small protest like this grow into large protests.
What I want is for you the members for Queensland, no matter what party you belong too put in 100% and get this MOTORWAY FIXED enough stalling and fix the BLOODY THING.
This GOAT TRACK affects approximately ONE Hundred and Forty Thousand Motorist ( Voters) Daily, Motorist from all over Queensland have to use this highway.
So when a fellow Queenslander from Roma or Mt Isa or Quilpie or Longreach has an accident on this highway they will remember.
If this road was around Canberra, it would have been fixed along time ago, well it is in Brisbane and affects the lives of average people on a daily basis.
I hope that you all had an enjoyable Christmas and a Safe one.
Awaiting your replies:.
Maarten Vanderhaar http://fix-ipswich-motorway-now.blogspot.com/
Labels: Political
Monday, October 30, 2006
Flyers Ipswich M/way
This may explain what the Federal Govt want to do about the DISASTER that is called the Ipswich M/way.
Letter from Mr Cameron Thompson MP ( Federal)
This is the ONLY reply that I have received from a member of parliament.At least he took the time to acknowledge my emails.
And he aslo bothered to send info on what is happening with the Ipswich M/way.
Wednesday, October 04, 2006
Email Reply from Mr Beattie Office.

Dear Maarten
Thank you for your email of 13 September 2006 concerning the upgrade of
the Ipswich Motorway. I have been requested to reply to you on the
Premier's behalf.
The Premier has noted the contents of your message and appreciates your
kind message of congratulations on his recent election victory.
As the matter you have raised falls within the responsibility of the
Honourable Paul Lucas MP, Minister for Transport and Main Roads, I have
taken the liberty of forwarding a copy of your email to him for his
consideration and reply direct to you.
Again, thank you for bringing this matter to the Premier's attention.
Yours sincerely
Rob Whiddon
Chief of Staff
Posted by Picasa
Sunday, September 17, 2006
Email to Mr Beattie
Mr Premier.
Congratulations on your win at the ballot box on saturday, now that you are back at work as stated on several news programs, I would like to know what is happening with the "Goat Track" that is called the Ipswich Motorway.
Before you blame the Federal Govt for all the problems, you might like to read an email that I received from Mr Cameron Thompson the Federal member for Blair.
I would appreciate your comments in response to the email and a progress report as to what is happening to the upgrade of the Ipswich Motorway.
And who is the person who is responsible for controlling any future progress as NOTHING has happened as YET!
You might also like to check out this blog site http://fix-ipswich-motorway-now.blogspot.com
Awaiting your reply.
Maarten
Congratulations on your win at the ballot box on saturday, now that you are back at work as stated on several news programs, I would like to know what is happening with the "Goat Track" that is called the Ipswich Motorway.
Before you blame the Federal Govt for all the problems, you might like to read an email that I received from Mr Cameron Thompson the Federal member for Blair.
I would appreciate your comments in response to the email and a progress report as to what is happening to the upgrade of the Ipswich Motorway.
And who is the person who is responsible for controlling any future progress as NOTHING has happened as YET!
You might also like to check out this blog site http://fix-ipswich-motorway-now.blogspot.com
Awaiting your reply.
Maarten
Reply from Mr Beattie Office.
The Premier
13-Sep (5 days ago)
Thank you for your message to the Premier. Your message has been forwarded to his office.
Ministerials Officer
Office of the Premier
13-Sep (5 days ago)
Thank you for your message to the Premier. Your message has been forwarded to his office.
Ministerials Officer
Office of the Premier